“AaryEV’s proactive service helped us achieve zero downtime across 60+ stations.”
— Head of Operations, Leading Utility Company
“Your team’s fast response and deep understanding of multi-brand charger systems has been critical for keeping our e-bus services reliable throughout the State network.“
— General Manager- Operation & Maintenance.
| Location | Srinagar |
|---|---|
| Scope | 8 × 240 kW DCFC + 2MVA Transformer + Panel Integration |
| Challenge | Rural connectivity & load balancing |
| Solution | AaryEV deployed Smart Load Management across sites |
| Outcome | Reduced downtime by 37% in 3 months |
| Location | High Altitude |
|---|---|
| Scope | 3 × 120 kW GB/T DCFC+ Site Survey & Power Load Study + 2MVA Transformer +Civil Foundation Work + Servo Stabilizer (45 kVA) +Civil Foundation Work+ Panel Integration |
| Challenge | Remote Location & Harsh Winters:
|
| Solution | AaryEVdeliver customized, rugged EVSE infrastructure even in extreme climates. The solution is scalable for future deployment across J&K and other hilly terrains. |
| Outcome | Successfully installed and commissioned a 120 kW DC Fast Charger (GB/T) for a State Transport Utility, enabling reliable EV bus operations in a remote Tier-II town. The project achieved:
|
This deployment demonstrated AarYEV’s ability to deliver robust EV infrastructure in challenging terrains and climates
“Due to confidentiality agreements, client names and branding have been withheld.
All project data presented is representative of real work delivered by AaryEV ®.”